Given the mess of untangling the CYC back-end systems from the existing CPS stuff I would really hope the new contract has a condition requiring them to keep the two operations separated. SWARCO may not have the contract for ever so they need to plan for a cleaner exit.
On the other hand as an EV driver it would be nice if existing Swarco accounts just worked with CPS.