Speak EV - Electric Car Forums banner
1 - 1 of 1 Posts

·
Registered
Joined
·
2 Posts
Hi all, FYI I ordered a 64kWh Ultimate with the optional heat pump and Pearl Black paint on 22nd Jan and were quoted 22wks, although he was optimistic that this would be brought forward (even with the non-standard production order).
 
1 - 1 of 1 Posts
Top