Speak EV - Electric Car Forums banner

1 - 5 of 5 Posts

·
Registered
Joined
·
2,626 Posts
Discussion Starter #1
Hello folks

Like me most of you have received a Twitter storm from @elechighway this morning as they announce the 1st stage of repairs to chargers.

This is (I believe) the replacement of a component which is sensitive to condensation with one which is not. This is supposed to alleviate the "Ground Fault" error.

There is supposed to be a second round of fixes - anyone got clues as to what the nature of this fix is, and also timescales?
 

·
Registered
Joined
·
8,106 Posts
They are keeping everything very close to their chest regarding these upgrades but they have said that the second round involves significant component replacement and a degree of redesign and should result in a reliable network.
 

·
Registered
Joined
·
28 Posts
I asked what the second stage was. They replied 'In the next couple of months there will be a permanent fix which will require a physical structural upgrade of the unit'. So frankly I'm none the wiser but it sounds positive.
 
1 - 5 of 5 Posts
Top