Joined
·
462 Posts
First Edition pre-orders have been allocated.
2 other variants available.
In bog standard form it’s 75kWh battery, 280 miles (not very efficient then). 0-60 in about 8 seconds.
OTR is anticipated to be £40,350 and that excludes any PiCG grant.
Production expected to start end of this year.
Opting for 98kWh battery in same spec adds about £9k!!
The centre console screen looks a bit Tesla but worse. Like a slab of glass just placed on there as an afterthought.
Anyway, if it can be had for £37k on the road then I think it’s half decent
2 other variants available.
In bog standard form it’s 75kWh battery, 280 miles (not very efficient then). 0-60 in about 8 seconds.
OTR is anticipated to be £40,350 and that excludes any PiCG grant.
Production expected to start end of this year.
Opting for 98kWh battery in same spec adds about £9k!!
The centre console screen looks a bit Tesla but worse. Like a slab of glass just placed on there as an afterthought.
Anyway, if it can be had for £37k on the road then I think it’s half decent