Speak EV - Electric Car Forums banner

1 - 4 of 4 Posts

·
Banned
Joined
·
0 Posts
Greetings from Warwickshire.
What was the lead time you were given? Out of interest I asked the dealer that I got my Niro 4 from and he said the 4+ is on a 4 to 5 month lead time.
 

·
Registered
Joined
·
23 Posts
Discussion Starter #3
I could have had the graphite 4 out of the show room but want the 4+.don't think he had a clue but plucked 6 to 8 months out of the air.btw what colour 4+ would you want I really wanted the midnight blue but is unavailable on 4+
 

·
Banned
Joined
·
0 Posts
I only ever go for graphite or black cars irrespective of make. My Niro 4 is graphite and I paid an extra £500 for it. Getting it ceramic coated in 3 weeks for another £700. I figure the money I save in petrol in year 1 can go towards the cost.

My dealer was spot on with his estimate of 9 months for the Niro 4 when I placed my order last November so if he says 5 months at the outside I tend to believe him. 6 months might be accurate but 8 seems a little too long.
 
1 - 4 of 4 Posts
Top