Speak EV - Electric Car Forums banner

ID.4 production kicks off in Emden

1025 Views 3 Replies 4 Participants Last post by  6652
And yet the waiting times...

The VW ID.4 is now also being produced in Emden. This means that the ID.4 is now built at the German sites in Zwickau and Emden as well as in the Chinese plants in Anting and Foshan. From autumn this year, production for the US market will start in Chattanooga.

ID.4 production kicks off in Emden - electrive.com
1 - 4 of 4 Posts
Well they may have got production line up and running but what about their supply chains...
Well they may have got production line up and running but what about their supply chains...
It’s a challenge, but this gives some idea how they’re making a bit of headway.


I was poking around my GTX not long after delivery, I was surprised at the diversity of the suppliers looking at all the part number labels in the engine bay.

I imagine those Indian, Eastern Europe, South African and South American suppliers that I found are being geared up to fill as much of the shortfall as possible.
  • Like
Reactions: 1
1 - 4 of 4 Posts
This is an older thread, you may not receive a response, and could be reviving an old thread. Please consider creating a new thread.
Top