My local DNO are re-supplying my house (at long last) to remove a looped supply with next door. While they are digging up outside I am going to lay the conduit for the cable in preparation for EV charging

Can anyone let me know what (if any) a post needs to be in order to be considered compliant with all the regs.

I have no preference personally, just a post on the end of the driveway is what I'm looking for, the cable run is about 15 meters and the material/colour etc. doesn't bother me. I'd just rather have the conduit and post in while the front path is being dug up.