Joined
·
313 Posts
My local DNO are re-supplying my house (at long last) to remove a looped supply with next door. While they are digging up outside I am going to lay the conduit for the cable in preparation for EV charging
Can anyone let me know what (if any) a post needs to be in order to be considered compliant with all the regs.
I have no preference personally, just a post on the end of the driveway is what I'm looking for, the cable run is about 15 meters and the material/colour etc. doesn't bother me. I'd just rather have the conduit and post in while the front path is being dug up.
Thanks in advance
Can anyone let me know what (if any) a post needs to be in order to be considered compliant with all the regs.
I have no preference personally, just a post on the end of the driveway is what I'm looking for, the cable run is about 15 meters and the material/colour etc. doesn't bother me. I'd just rather have the conduit and post in while the front path is being dug up.
Thanks in advance