Speak EV - Electric Car Forums banner

1 - 5 of 5 Posts

·
Registered
Joined
·
585 Posts
Discussion Starter #1
I've been offered a free charger install later in a few days time.

However, I've just been told that due to my "non-standard" install, I'm going to have to pay another £100.
Is this usual? o_O

The non-standard part is a Henley Block, a 4 way Distribution Board (as my existing one is full) and 3 extra metres of cable out to the charger.
 

·
Super Moderator
Joined
·
7,509 Posts
I paid £96 extra for trunking going through my living room, then a conduit running down the garden, lagged to the fence, round a corner and then through the end fence up to a wall. I think you're doing alright!
 
1 - 5 of 5 Posts
Top