I was down there today and there is a new Triple head? ( AC one side DC other side and a type 2 socket in the middle). Not yet commissioned, in fact no power and the ends of the cables are still wrapped in their boxes on the ground. I think it will be on the CYC the same as the fast chargers alongside. An alternative to the Ecotricity one at Granada services just over the motorway.