I had a quote to get 3P installed during a refurb. UKPN wanted 2.5k to run the cable from the street to an external meter box. About 15m run. For that price, I would have to do all the ground works on my land and provide a new meter cabinet (existing install is indoors). I would also have to organise the meter install and connection to the CU. Electrician didn’t think it was worth it as highly unlikely we would have ovens, induction hob, HP and car charger all running at full load at the same time. Peak load so far has been 14kW so he wasn’t wrong..