Charger installation nightmare: after a week from hell at work, with health and other things, I thought at least today's charge point installation would go well. Nope.
Guy turned up an hour late and insisted it was fine to go ahead in the pouring rain.
He didn’t really position it where I said I really wanted it, then after 90 mins he admitted he's installed other brands but never a PodPoint.
He wasn't able to complete, test or commission it, and none of his team picked up his calls. Saturday, after all, the date chosen by them not me. It's not all the contractor's fault, but I've lost trust in the firm that sent him.
And due to work, storm Arwen damage being repaired over the next few days, hospital visits, etc, it's not convenient for me for them to return til late December. Great 🥲
Guy turned up an hour late and insisted it was fine to go ahead in the pouring rain.
He didn’t really position it where I said I really wanted it, then after 90 mins he admitted he's installed other brands but never a PodPoint.
He wasn't able to complete, test or commission it, and none of his team picked up his calls. Saturday, after all, the date chosen by them not me. It's not all the contractor's fault, but I've lost trust in the firm that sent him.
And due to work, storm Arwen damage being repaired over the next few days, hospital visits, etc, it's not convenient for me for them to return til late December. Great 🥲