Speak EV - Electric Car Forums banner

Fastned new UK sites

19K views 98 replies 29 participants last post by  Throb  
#1 · (Edited)
Quick run down on new Fastned sites that have opened this year (and others in construction and planning)

(Edit @ 2 July 2024)

Newly Opened:
  • Dalgety Bay, A921 - 1 July 2024
  • Forrest Park Durham, off J59 A1(M) - 1 July 2024 DM/21/04291/FPA
  • Haydock, Galway Crescent - 25 March 2024
  • Andover, Columbus Way - 17 January 2024
  • Basildon, St Hilarys Retail Park / Miles Gray Road - 21 December
  • Camborne, A30 - 22 December
  • Colchester, A12 Northern Gateway - 27 November
  • Swindon, Barnfield Close - 15 September
  • Melksham, Commerce Way - 12 September
  • St Albans, Griffiths Way - 22 July
  • Martlesham, Park & Ride - 16 February 2023
Waiting Energisation:
  • TBC
In Construction:
  • TBC
In Planning:
 
#97 ·
Fastned Hub
46 Virginia Street
Aberdeen
AB11 5AU

(6) Fastned Rapids

Pending


250680/DPP | Change of use to an indoor electric vehicle (EV) charging station; installation of rooflights and canopy, rendering of external walls, extend boundary wall, replacement glazing; new vehicular access; amenity area comprising small shop with waiting area, separate toilets, interactive amenities and seating; landscaping; rooftop solar panels; associated substation, low voltage switchboard and all ancillary and associated works .
https://publicaccess.aberdeencity.g...nline-applications/applicationDetails.do?activeTab=summary&keyVal=SYISDYBZKAX00

Image


Image
Image
Image


Image


Image
 
#98 ·
An indoor charging area is a good idea for Aberdeen, where winter is always dark and often miserable. But I'm surprised they think all this will be profitable with just 6 rapids. Maybe they mean 12 vehicles can charge at a time?

Things like forecourt shops, toilets, cafes and waiting areas will become more normal once 50-rapid hubs become the norm, rather than where there are a dozen or less.
 
#99 ·
An indoor charging area is a good idea for Aberdeen, where winter is always dark and often miserable. But I'm surprised they think all this will be profitable with just 6 rapids. Maybe they mean 12 vehicles can charge at a time?
The drawings show 6 units and 12 parking spaces. Each of the 6 charging units can charge two cars at a time.