Land At Wycke Hill
Maldon
Essex
CM9 6GG

(3) be.EV Rapids

Pending consideration

24/00313/FUL|Provision of infrastructure to provide electric vehicle charging facilities for six parking bays, comprising of three charger pillars and associated bollards, one feeder pillar, and one substation.
Image
Image
 
St Nicholas Retail Park
Edward Benefer Way
King's Lynn
PE30 2HY

(4) Instavolt Rapids

Awaiting decision

24/00599/F
Proposal for the installation of four rapid electric vehicle charging stations and ancillary equipment within the car park of St Nicholas Retail Park. Five existing parking spaces will become EV charging bays.


Image
 
Donington Park Service Area
Junction 23A
Retention of electric vehicle charging hub with associated works (part retrospective) and installation of a further 6 no. bay electrical charging hub.
I think this will really help. It's a chaotic set-up there currently, cables crossing over each other. And when a space becomes available, you need to go right round the one-way system again, just to find somebody has taken the spot.
 
Morrisons Netherfield MFG
4 Victoria Park Way
Netherfield
Nottinghamshire
NG4 2PA

(4) MFG Rapids

Application Validated : Fri 29 Mar 2024

Status : Unknown

2024/0222|Creation of an EV charging zone including the erection of a canopy as well as sub-station and LV enclosures and associated works.


Image
Image
Image
 
McDonald's
Cheriton High St
Folkestone
CT19 4QJ

(4) Instavolt Rapids

Planning Granted


Installation of four rapid electric vehicle charging stations and ancillary equipment within the car park
Six existing parking spaces will become EV charging bays.



Image
 
I wonder if this has significance given these are all Morrisons sites or just an aberration?
Could be any number of reasons. In some cases they don't actually need planning to do the install. Though a canopy would likely necessitate it. In other cases an external factor may have quashed things. Would be interesting to look at any of the documents or comments from important organisations. Of course it could also be internal to the MFG-Morrisons deal and their shared parent.
 
I expect some of these withdrawn planning applications will be resubmitted with modifications. I hope MFG is getting planning permission faster then they can install chargers, I assuming nearly all Morrisons already have enough unused 11kv capacity to the sites.
 
I expect some of these withdrawn planning applications will be resubmitted with modifications. I hope MFG is getting planning permission faster then they can install chargers, I assuming nearly all Morrisons already have enough unused 11kv capacity to the sites.
What I found interesting is that when they installed the Geniepoint at the Morrisons around the corner they ran the power from the main road and not from the supermarket. So who knows about that site.
 
What I found interesting is that when they installed the Geniepoint at the Morrisons around the corner they ran the power from the main road and not from the supermarket. So who knows about that site.
I expect many of the stores will need new private transformers connected to their 11kv feeds to power charging clusters. If putting in a single charger it likely to be cheapest to connect into the nearest 415 volt cable.
 