Speak EV - Electric Car Forums banner
81 - 99 of 99 Posts
Morrisons in Cromer is dead last couple of visits I’ve been. It’s been only AC charging which is ok but often unreliable.

I vaguely recollect seeing on here plans for an MFG install at the Morrisons in Cromer - if so it would be great addition. Given the large up from London contingent in the area there’s no shortage of EV’s…
 
Only 2 Ospreys at the Running Horse, Fakenham I think.
A couple of Genie points nearby at Morrisons, although according to ZapMap they appear to have been replaced by MFG.
The only time I tried them, they worked although it took a while to get them working, and then I never received a bill so got a free charge.
 
Fastned Hub
2 Paynes Ln
Boreham
Chelmsford
CM3 3HH

(10) Fastned Rapids

Pending Consideration

25/01092/FUL | Installation of 20no. Electric Vehicle (EV) charging spaces with solar canopies; an ancillary unit providing toilet facilities, a small retail area and waiting/seating area; landscaping; wayfinding signage; and associated substation, LV switchboard and ancillary works | Land North West Of Mill Mead Cottages Paynes Lane Boreham Chelmsford Essex
https://publicaccess.chelmsford.gov...nline-applications/applicationDetails.do?activeTab=summary&keyVal=SZR7B5BRGY900
Image


Image


Image
Image



Image
 
Discussion starter · #92 ·
Fastned Hub
2 Paynes Ln
Boreham
Chelmsford
CM3 3HH

(10) Fastned Rapids

Pending Consideration

25/01092/FUL | Installation of 20no. Electric Vehicle (EV) charging spaces with solar canopies; an ancillary unit providing toilet facilities, a small retail area and waiting/seating area; landscaping; wayfinding signage; and associated substation, LV switchboard and ancillary works | Land North West Of Mill Mead Cottages Paynes Lane Boreham Chelmsford Essex
https://publicaccess.chelmsford.gov...nline-applications/applicationDetails.do?activeTab=summary&keyVal=SZR7B5BRGY900
View attachment 215678

View attachment 215679

View attachment 215680 View attachment 215681


View attachment 215682
Good to see them still building more in the East. I thought they may have been satisfied to sit with Martlesham, Colchester and Basvegas.
 

New Fastned hub under construction near Newcastle Airport.
Turns out the hub is next to Callerton Parkway Metro station, on the western side of the railway. I'll add the planning ref in later.

Image

Image

Image

Image
 
Turns out the hub is next to Callerton Parkway Metro station, on the western side of the railway. I'll add the planning ref in later.

View attachment 215923
View attachment 215926
View attachment 215925
View attachment 215924
Planning Ref for the above:

Application Reference Number:
2023/1076/01/DET

Proposal:
Demolition of existing industrial building and construction of electric vehicle charging station and drive-thru Food & Beverage unit, electric sub-station and associated landscaping and infrastructure.

(12) spaces, across (6) Fastned Rapids, under canopies

Location:
Callerton Station Callerton Lane, Newcastle Upon Tyne, NE13 8BP

Decision Issued Date:
20-02-2024

Decision:
Grant Conditionally
 
Fastned Hub
Land North East Of Hanborough Road
Eynsham
Oxfordshire

(6) Fastned Chargers

Under consideration

25/01767/FUL Installation of 12no. Electric Vehicle (EV) charging spaces, an unmanned amenity unit, associated substation, LV switchboard and ancillary works including alterations to existing access, to form an EV charging hub at the junction of A40 and B4449, with wayfinding totem and fascia signs.
25/01767/FUL | Installation of 12no. Electric Vehicle (EV) charging spaces, an unmanned amenity unit, associated substation, LV switchboard and ancillary works including alterations to existing access, to form an EV charging hub at the junction of A40 and B4449, with wayfinding totem and fascia signs. | Land North East Of Hanborough Road Eynsham Oxfordshire
Image




Image
Image

 
Fastned Hub
46 Virginia Street
Aberdeen
AB11 5AU

(6) Fastned Rapids

Pending


250680/DPP | Change of use to an indoor electric vehicle (EV) charging station; installation of rooflights and canopy, rendering of external walls, extend boundary wall, replacement glazing; new vehicular access; amenity area comprising small shop with waiting area, separate toilets, interactive amenities and seating; landscaping; rooftop solar panels; associated substation, low voltage switchboard and all ancillary and associated works .
https://publicaccess.aberdeencity.g...nline-applications/applicationDetails.do?activeTab=summary&keyVal=SYISDYBZKAX00

Image


Image
Image
Image


Image


Image
 
An indoor charging area is a good idea for Aberdeen, where winter is always dark and often miserable. But I'm surprised they think all this will be profitable with just 6 rapids. Maybe they mean 12 vehicles can charge at a time?

Things like forecourt shops, toilets, cafes and waiting areas will become more normal once 50-rapid hubs become the norm, rather than where there are a dozen or less.
 
An indoor charging area is a good idea for Aberdeen, where winter is always dark and often miserable. But I'm surprised they think all this will be profitable with just 6 rapids. Maybe they mean 12 vehicles can charge at a time?
The drawings show 6 units and 12 parking spaces. Each of the 6 charging units can charge two cars at a time.
 
81 - 99 of 99 Posts